Renovation jacking method×ベル・ミクロ工法協会 - メーカー・企業と製品の一覧

Renovation jacking methodの製品一覧

1~1 件を表示 / 全 1 件

表示件数

Static Crushing Reconstruction Advancement Method "Bell Replace Method"

Achieving renovation promotion with excellent cost-effectiveness and construction speed! Construction is possible even under conditions with groundwater.

The "Berliplace method" involves inserting a pilot crusher into an existing pipe, expanding and crushing the existing pipe while advancing with a tunneling machine that collects debris, and pushing in a new pipe (PVC pipe). The pilot crusher is equipped with crushing blades and a water-stopping device, allowing construction even under groundwater conditions. It contributes to the longevity of PVC pipes and reduces lifecycle costs. 【Features】 ■ Contributes to the lifecycle cost (LCC) and longevity of sewer pipes through the advantages of PVC pipes ■ Proven advancement rate of over 15m per day ■ Cost reduction achieved through increased tunneling speed ■ Capable of reaching the first manhole ■ Economical *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録